05_TEST.png

June 20, 2023by Marcela Herrera

Earth movement, civil Works, electromechanical and piping erection; electrical and instrumentation installation for the 3rd thickener. It also includes a Shaft with a new pump system, electrical room and others.


02_sqm.png

June 18, 2023by Marcela Herrera

Civil, Electromechanical and Structural Assembly corresponding to the expansion of the Lithium carbonate Plant and the Lithium Hydroxide Plant. "FastTrack" project with day and night shifts.


GOLD-FIELDS-1280x969.jpg

June 17, 2023by Marcela Herrera

Propulsion system from well water zone up to water transfer tank and fresh water tank. Includes the installation of 10 Km of 8” Steel pipe and 6Km of 14” HDPE pipe, plus all associated civil Works. Located at more tan 4.400 m.a.s.l.


Codelco-MH-84-640x640.jpg

January 2, 2019by Rodrigo Prieto

Engineering, supply and construction of the dome and auxiliary systems. This project contemplates the transport of copper concentrate from the filtration plant to a reinforced concrete dome, where it is stored (30.000 metric tons), using a tubular conveyor belt. The concentrate is distributed by a stacker; a reclaimer takes it to the main hopper, unloading into two underground conveyor belts, which take the concentrate to the Roasting Plant.


domo-esperanza-cuadrado.png

May 10, 2017by Rodrigo Prieto

Construction and assembly of a structural dome for the existing stockpile, built with a special condition: the overland conveyor belt never stopped, generating complex work conditions of dust due to the permanent wind. The dimensions of the dome were 117 m in diameter and 47 m height.


COMPAÑIA-MINERA-DEL-PACIFICO-42-cuadrado.jpg

April 10, 2017by Rodrigo Prieto

Basic and detail engineering, supply, construction and startup of the emissions abatement system for a furnace located in Planta Huasco. Consisted in the implementation of an electrostatic precipitator and a wet desulphurizer and auxiliary parts, for a gas flow of 500.000 Nm3/h.


Bitnami