Electromechanical assembly of pyrite flotation cells, and other works, in “Brownfield” zone, during full operation of the plant.
Electromechanical assembly of pyrite flotation cells, and other works, in “Brownfield” zone, during full operation of the plant.
Civil Works and electromechanical assembly of a fifth boost pump as well as water tanks and auxiliary material in four pumping stations of the water pipeline between Michilla and Minera Antucoya.
Civil Works and electromechanical assembly of a terminal for trucks and trains, stockpile and conveyor belts to feed vessels on port.
Engineering, supply and construction of a copper concentrate stockpile with a capacity of 60,000 tons, including unloading terminals for trucks and trains.
Construction and assembly of new Colina Smelter. Earthwork and civil works, structural and mechanical assembly, piping, power assembly and control, including personnel facilities and urbanization.
Final civil and electro-mechanical works for the Michilla Dock Plant. This included works in the thickener, filter plant and stockpile until Start up.
While the Minera Esperanza Plant was being built, PUMA participated in various projects from the very beginning: Engineering and construction of the Integrated Operations Center (COI), Sampling and Laboratory Complex (CML), Maintenance workshop for the Plant (TMP), Main warehouse. Miscellaneous civil and electromechanical works, such as reinforcement of the concrete thickener TK-01, Support in the commissioning and start-up of the plant. Replacement of 1,500 coated spools of the plant´s piping.
Built on-site, new precipitators electromechanical assembly and interconnection during Codelco Ventana’s Smelter plant outage.
Mechanical and structural assembly, power and control of new equipment to transform and enhance the capacity in the process of salt production