Basic and detail engineering, supply and construction of a terminal for the reception of sulfuric acid carried by train; storage tank and truck loading stations.
Basic and detail engineering, supply and construction of a terminal for the reception of sulfuric acid carried by train; storage tank and truck loading stations.
Construction and assembly of the new Clinker grinding plant in San Antonio. Included civil works, concrete silo, electro-mechanical assembly and architecture works.
Removal of the existing metal dome that collapsed due to overloading. Civil works and assembly of a new structural dome built while facility was in operation, with relevant impacts of wind and dust.
Disarm and demolition of processing plants at Indio Area, reactive plant and Tambo area. “Cut & Pull” system with shears and grapples, plus special explosives were used for metal structures. included handling, loading and transportation of scrap to the recycling plant.