CMPC-PLANTA-PACÍFICO.jpg

June 14, 2023by Marcela Herrera

Intallation of a new Dregs washing system, making posible the commercialization of the Dregs. Considers the installation of a centrifugal Dregs washing system, including mechanical equipment (pumps, tanks, hoppers, etc.) and the extensión of the existing Electrical Room.


VOLCAN-1280x858.jpg

June 13, 2023by Marcela Herrera

Civil, Strcutural, Mechanical, Piping, Electrical & Control and Start up of a New Plant to produce Plasterboard panels, with a capacity of 18 million square meters per year, scalable to 30 million.


ESEL-18-cuadrado.jpg

May 31, 2011by Rodrigo Prieto

Construction and assembly of new Colina Smelter. Earthwork and civil works, structural and mechanical assembly, piping, power assembly and control, including personnel facilities and urbanization.


044-ESSO-1-1.jpg

Disarm and demolition of COPEC and ESSO fuel storage plant. “Cut & Pull” systems with shears y grapples were used. Included handling, loading and transportation of scrap to the metal scrap recycling plant.


ESSO-COPEC14-cuadrado.jpg

June 9, 2006by Rodrigo Prieto

Disarm and demolition of COPEC and ESSO fuel storage plant. “Cut & Pull” systems with shears y grapples were used. Included handling, loading and transportation of scrap to the metal scrap recycling plant


Bitnami