Minera El TesoroDome Reconstruction
Removal of the existing metal dome that collapsed due to overloading. Civil works and assembly of a new structural dome built while facility was in operation, with relevant impacts of wind and dust.
- Category
- MiningStock Piles
- Year
- 2005
- Location
- El Tesoro, II Region.