https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER1.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER2.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER3.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER4.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER5.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER6.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER7.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER8.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER9.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER10.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER11.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER12.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER13.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER14.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER15.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER16.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER17.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER18.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER19.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER21.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER22.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER23.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER24.jpg
https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER47.jpg

PES (Enel Green Power)

Title:

Description:

PES (ENEL GREEN POWER)1
PES (ENEL GREEN POWER)2
PES (ENEL GREEN POWER)3
PES (ENEL GREEN POWER)4
PES (ENEL GREEN POWER)5
PES (ENEL GREEN POWER)6
PES (ENEL GREEN POWER)7
PES (ENEL GREEN POWER)8
PES (ENEL GREEN POWER)9
PES (ENEL GREEN POWER)10
PES (ENEL GREEN POWER)11
PES (ENEL GREEN POWER)12
PES (ENEL GREEN POWER)13
PES (ENEL GREEN POWER)14
PES (ENEL GREEN POWER)15
PES (ENEL GREEN POWER)16
PES (ENEL GREEN POWER)17
PES (ENEL GREEN POWER)18
PES (ENEL GREEN POWER)19
PES (ENEL GREEN POWER)21
PES (ENEL GREEN POWER)22
PES (ENEL GREEN POWER)23
PES (ENEL GREEN POWER)24
PES (ENEL GREEN POWER)47

PES (Enel Green Power)BOP Gathering – Geothermal Plant, Cerro Pabellón

Construction and electro-mechanical assembly of the interconnection system between the different pits and the 50MW geothermal plant. Consists of the construction of stations for separation of solid materials, station for the re-injection and pumping of condensed material, plus 15 kilometers of pipeline to connect the plant and 6 extraction and re-injection pits. Project successfully executed in the Ollagüe area, that took 400,000 man/hours with staff working at 4,600 meters above sea level, in high mountain conditions, facing low temperatures and strong winds.
Category
Energy
Year
2016
Location
Cerro Pabellón, Calama